The presplit technique is the most commonly used controlled blasting technique for surface operations. 3. Methods 3.1. Line drilling Line drilling has a number of requirements that must be satisfied to ensure success. The first requirement is that the drill holes must be 38 to 76 mm in diameter and not loaded with explosives.
Получить ценуpresplitting is accomplished by drilling holes on one and one-half to five foot centers on the slope plane and shooting the holes with dynamite using primacord. the drill holes are made by percussion type drills. the air space around the explosive is filled with fine stone or coarse sand. presplitting is an ecnomical technique for blasting rock ...
Получить ценуIn this study, a large open pit mine was the case study for the goal of designing pre-splitting through implementation of direct and cost effective experiments. Three tests were designed and ...
Получить ценуPresplitting is more accurate than smooth blasting, but has the limit of not being c veniently applicable underground (especially in tunneling), where the presence of o one free surface could ...
Получить ценуВзрывные работы. ВЗРЫВНЫЕ РАБОТЫ (а. blasting, shotfiring; н. Schie ß arbeiten, Schie ß en; ф. travaux а l'explosif; travaux dus au tir; и. trabajos соn explosivos) — совокупность операций по подготовке и инициированию зарядов взрывчатого ...
Получить ценувзрывные изоляционные работы в скважинах; другие технологические операции в скважинах, связанные с применением ПВА при строительстве, исследованиях и эксплуатации скважин.
Получить ценуПРЕДИСЛОВИЕ Взрывные работы широко применяются в различных отраслях промышленности, прежде всего при добыче полезных ископаемых и в строительстве. Требования к производству взрывных ...
Получить цену205.3.7.2 Presplitting Rock (1) If the plans show or the engineer authorizes, employ the presplitting technique to split the face of the rock cut in a relatively smooth plane along the designated backslope, before removing the interior portion of the cut by blasting.
Получить ценуВзрывные работы широко применяются в народном хозяйстве страны. Трудно найти отрасль, которая бы не использовала энергию взрыва в созидательных целях. Около 80 % минералы
Получить ценуВзрывные работы Взрывные работы Популярное за неделю Электронные книги на русском 0 PDF М. А. Илюшин Промышленные взрывчатые вещества. Учебное пособие для вузов 0 PDF Александр Исаакович Бенин Термические опасности и термическая безопасность энергонасыщенных веществ, химических процессов и объектов их …
Получить ценуPresplitting and Production Blasting of Rock Slope Cuts . 2103.01 Description. A. These specifications cover the work of presplitting a rock slope cut by establishing a free surface in the rock by the controlled use of explosives placed in properly aligned and spaced drill holes. The contract documents may specify more than one elevation level ...
Получить ценуБуро-взрывные работы являются одним из труднейших процессов технологии добычи камня. Затраты на буро-взрывные работы составляют 20—30% себестоимости щебня. Методы разрушения горных пород ...
Получить ценуПБ 1052.8 (ПБП 1052.8) - Подготовка и аттестация руководителей и специалистов организаций, осуществляющих взрывные работы на открытых горных разработках и специальные взрывные работы Экзаменационные билеты по Б.12.2 ...
Получить ценуПри производстве взрывных работ в подземных горных выработках сменный запас взрывчатых материалов допускается хранить вблизи мест взрывных работ в отдельных металлических ящиках и контейнерах (сейфах), оборудованных в соответствии с требованиями пунктов 538 и 540 настоящих Правил и имеющих замки.
Получить ценуThe presplit technique is the most commonly used controlled blasting technique for surface operations. 3. Methods 3.1. Line drilling Line drilling has a number of requirements that must be satisfied to ensure success. The first requirement is that the drill holes must be 38 to 76 mm in diameter and not loaded with explosives.
Получить ценуIn tunnels and underground excavations: Sound-wall blasting …met by the technique of presplitting, developed in the United States in the late 1950s. Basically, this technique consists of creating a continuous crack (or presplit) at a desired finished excavation line by initially firing a line of closely spaced, lightly loaded holes drilled there.
Получить ценуpresplitting is accomplished by drilling holes on one and one-half to five foot centers on the slope plane and shooting the holes with dynamite using primacord. the drill holes are made by percussion type drills. the air space around the explosive is filled with fine stone or coarse sand. presplitting is an ecnomical technique for blasting rock ...
Получить ценуPresplitting and Production Blasting of Rock Slope Cuts . 2103.01 Description. A. These specifications cover the work of presplitting a rock slope cut by establishing a free surface in the rock by the controlled use of explosives placed in properly aligned and spaced drill holes. The contract documents may specify more than one elevation level ...
Получить ценуWhen presplit blasting is applied to the excavation of rock well, the delay times for peripheral and main boreholes are 0 ms and 110 ms, respectively. When smooth blasting is applied to excavation of rock well, the delay times for peripheral and main boreholes are 110 ms and 0 ms, respectively.
Получить ценуВзрывные работы. ВЗРЫВНЫЕ РАБОТЫ (а. blasting, shotfiring; н. Schie ß arbeiten, Schie ß en; ф. travaux а l'explosif; travaux dus au tir; и. trabajos соn explosivos) — совокупность операций по подготовке и инициированию зарядов взрывчатого ...
Получить цену205.3.7.2 Presplitting Rock (1) If the plans show or the engineer authorizes, employ the presplitting technique to split the face of the rock cut in a relatively smooth plane along the designated backslope, before removing the interior portion of the cut by blasting.
Получить ценуВзрывные работы широко применяются в народном хозяйстве страны. Трудно найти отрасль, которая бы не использовала энергию взрыва в созидательных целях. Около 80 % минералы
Получить ценуРоссия, 115230 г. Москва Каширское шоссе, д.4, кор. 2, пом. XII, комн. 4. Тел: 8 (499) 755-65 86 E-mail: [email protected] [email protected] Снос зданий и сооружений взрывом - специальные работы Специалистами ООО "ЮНИЭКСПЛ" разработано и реализовано более 70 проектов производства взрывных работ.
Получить цену«Взрывные работы» – скачивайте книги и аудиокниги в любом формате на сайте электронной библиотеке Литрес или читайте онлайн бесплатно.
Получить ценуВзрывные работы в искусственно замороженных породах или в зонах сжатого воздуха (кессонах) должны проводиться только по проектам. 11. При проходке и углубке стволов шахт взрывание ...
Получить ценуВзрывные работы должны выполняться взрывниками под руководством лица, назначенного приказом по организации, ведущей взрывные работы (руководителя взрывных работ), по письменным нарядам ...
Получить ценуВзрывные выработки подразделяют на шпуры, скважины, котловые шпуры и скважины, рукава, зарядные камеры. Вспомогательными выработками являются вертикальные шурфы сечением 1,0×1,2 м и горизонтальные штольни и рассечки сечением 1,0×1,6 м. Шпуры и скважины бывают вертикальные, наклонные …
Получить ценуПеревод "взрывные работы" на английский Сущ. blasting explosives explosions blasted Такой вариант актуален при плотном расположении соседних конструкций, которые затрудняют использование спецтехники и исключают взрывные работы.
Получить ценуJulian Cleeton, director of Stemtek, examines the conventional and alternative methods for achieving a stable face. Pre-splitting can be defined as ‘a technique using lightly …
Получить ценуMeanwhile in Sweden, presplitting is a major part of the operation at the Aitik mine with ROC rigs doing the presplitting work and Pit Viper rigs taking care of the …
Получить ценуВзрывные работы — работы по раздроблению, разрыхлению и выброске горных пород, земли, льда и т. п., совершаемые за счет энергии разложения взрывчатых …
Получить ценуВзрывные работы. ВЗРЫВНЫЕ РАБОТЫ (а. blasting, shotfiring; н. Schie ß arbeiten, Schie ß en; ф. travaux а l'explosif; travaux dus au tir; и. trabajos соn explosivos) — …
Получить ценуПри производстве взрывных работ необходимо строго соблюдать утвержденные Госгортехнадзором «Единые правила безопасности при взрывных …
Получить ценуРоссия, 115230 г. Москва Каширское шоссе, д.4, кор. 2, пом. XII, комн. 4. Тел: 8 (499) 755-65 86 E-mail: [email protected] [email protected] Снос зданий и сооружений …
Получить цену«Взрывные работы» – скачивайте книги и аудиокниги в любом формате на сайте электронной библиотеке Литрес или читайте онлайн бесплатно.
Получить ценуВзрывные работы в искусственно замороженных породах или в зонах сжатого воздуха (кессонах) должны проводиться только по проектам. 11. При проходке и …
Получить ценуThese two detonators in each hole are fixed at the top and bottom of charge, respectively. When presplit blasting is applied to the excavation of rock well, the delay …
Получить цену